Modelling and Testing System for Optimising Energy at Gutovka Sports Centre

Smart Buildings and Energy

image-modelling_and_testing_system_for_optimising_energy_at_gutovka_sports_centre

The project aims to optimise energy within the sports centre by installing suitable technologies, especially the implementation of the so-called trigeneration heat pump (producing heat and cold at the same time), solar panels, reservoirs for warm water, and a backup battery for technologies that use surpluses.

 

Function:

  • Installation of a heat pump technology
  • Installation of solar panels
  • Implementation of a system for smart management of energy consumption and monitoring
  • Installation of sensors measuring the condition of the environment

 

Benefit:

  • Energy savings
  • Verification of the trigeneration technology
  • Increased awareness regarding the possibilities of energy use and consumption monitoring

 

Project status

Done

Prague 10 Municipal District

Smart Prague Index

Purple smartmetermetodika hodnocení

Have you got an idea how to improve Prague?